Tue, 24 Nov, 2026, 12:02 pm
Mumbai’s Elphinstone Road Double-Decker Bridge Is 63% Complete, Will Ease Traffic
Reported by Curly Tales
Construction of the new double-decker bridge at Elphinstone Road in Mumbai has reached 63% completion. The bridge is a key component of the Mumbai Metropolitan Region Development Authority’s (MMRDA) Sewri-Worli Connector, which aims to improve connectivity across the city and ease traffic movement from the Atal Setu. Work is currently progressing on the approach roads at both ends of the bridge, alongside the main structural construction. Scroll down to know more.
Elphinstone Road Double-Decker Bridge To Carry Local And Connector Traffic
The reconstructed railway overbridge (ROB) at Elphinstone Road is being developed with a two-level design to accommodate different categories of traffic. While the lower deck will be dedicated to local commuters, the upper deck will carry vehicles travelling along the elevated Sewri-Worli Connector.
This arrangement is expected to streamline traffic movement by separating local road users from vehicles using the larger infrastructure corridor. The double-decker structure will also play an important role in connecting the Sewri-Worli Connector with the surrounding road network.