Skip to content
city

Wed, 11 Nov, 2026, 11:58 pm

MMRDA Scraps Uttan Dongri And Pahadi Goregaon Car Shed Plans, 12,000 Trees To Be Spared

Reported by Free Press Journal

The Mumbai Metropolitan Region Development Authority (MMRDA) has dropped its plans to build separate Metro car sheds at Uttan Dongri for Metro Line 9 and Pahadi Goregaon for Metro Line 6, 4 with the authority opting to maintain trains of multiple corridors at common facilities.

Shared Metro Depots Expected To Reduce Costs And Land Acquisition ChallengesA MMRDA Official said every Metro line does not require a dedicated car shed in initial stages of operations, as trains operating on interconnected corridors can be maintained at a shared depot.

The approach is expected to reduce infrastructure costs and address some of the challenges associated with acquiring land and developing new maintenance facilities.

The decision is also expected to spare around 12,000 trees that would have been affected by the proposed car shed at Uttan Dongri, according to the official.

Metro Line 9 Trains To Be Maintained At Charkop DepotTrains operating on Metro Line 9, which connects Dahisar East with Mira-Bhayandar, will instead be maintained at the Charkop depot, currently serving Metro Line 7.

Read the full report at Free Press Journal