Skip to content
weather

Fri, 20 Nov, 2026, 09:51 am

After flooding chaos, Mogra Nullah cleaned

Reported by Mumbai Mirror

Following sharp criticism over severe waterlogging at the Andheri Subway during Wednesday morning’s pre-monsoon showers, the Brihanmumbai Municipal Corporation (BMC) swung into action to clear the Mogra Nullah and restore the smooth flow of rainwater.

The crucial subway link was completely submerged after just half an hour of rain, bringing vehicular traffic to a standstill for more than two hours and leaving commuters stranded. An immediate inspection by civic officials found that the Mogra Nullah, which drains the entire catchment area, was heavily choked.

Defending its pre-monsoon preparations, the BMC maintained that desilting of the Mogra Nullah had been completed before the showers. According to officials, the sudden blockage was caused by a massive influx of floating material, primarily plastic waste, carried into the drain by rainwater runoff.

Civic officials said the removal of floating debris is a continuous process and that such waste can quickly accumulate during intense rainfall, restricting the flow of water.

Engineers also pointed to structural constraints in the drainage network. According to the BMC, the width of the nullah narrows significantly beneath the subway, creating resistance to the natural flow of rainwater.

Read the full report at Mumbai Mirror